For the last eight months, Salem Street has been a one-way road. Since late January, downtown Apex has been running southbound only between Saunders and West Chatham, the GoApex Route 1 bus has been on detour, and residents who used to swing through downtown on autopilot have quietly rerouted their weekends toward Pleasant Park and Sweetwater. Fall is when that changes.
The Salem Streetscape project is on track to wrap in October, according to Mayor Jacques Gilbert, and two-way traffic returns with it. That single deadline reorganizes the season. If you live in Apex, the fall calendar is essentially a series of moments designed to pull you back to a block you have been treating as closed since winter.
The town committed more than $4.7 million to remake North Salem Street with new walkways, lighting, trees, and a curbless pedestrian design. Work began in January 2026, hit a pause in the spring while designers revised electrical plans, and picked back up with roughly a 60-day dent in the schedule that pushed finishing work deeper into the fall. Mayor Gilbert has stayed with the October target publicly, and the town's project page still lists a construction contract window of January through December 2026, which gives the crews a small tail if they need it.
The impact on operators has been real. A manager at Anna's Pizzeria told WRAL that foot traffic was tracking 10 to 20 percent below normal during the construction, and Larry Seiger, who runs Virtuoso Jewels on Salem, has been asking mostly for clearer communication about when the crews are on site. That is the backdrop for fall. Every event and reopening on the calendar between September and December is doing double duty as a signal that downtown is coming back.
The finished Salem Street is not a repave. It is a different kind of street. When the barriers come down, the block between Saunders and Chatham will read closer to a European market lane than the road you remember from 2023.
Shannon Cox, the town's Long Range Planning Manager, has framed the project as a careful edit of a historic street rather than a rebuild, which explains why the changes are dimensional rather than cosmetic. Wider walking room, more shade, and event-ready hardware are the actual deliverables.
Downtown's fall lineup was set before anyone knew exactly when the crews would finish, so the events are hedged across venues. Here is what to plan around.
| Date | Event | Location |
|---|---|---|
| Saturday, Sept. 26, 2026 | Apex Latino Arts & Culinary Festival | The Depot, 220 N Salem St |
| Monday, Oct. 12, 2026 | Apex Indigenous Peoples' Day | Downtown Apex |
| Target: late October 2026 | Salem Streetscape completion, two-way traffic returns | N Salem St, Saunders to Chatham |
| December 2026 | Apex Rotary Christmas Parade | Downtown Apex |
The Latino Arts & Culinary Festival is the anchor of the fall opening. Country booths represent Central and South America, and the food vendor list reads like a short tour of the region: Che Empanadas from Argentina, 2 Boys Tacos and Burritos from El Salvador, La Rancherita from Mexico, Alpaca from Peru, El Triple Tazos NC from Puerto Rico, and Gaby Ice Paletas. Georges Le Chevallier leads a mural painting activity, Peter Marin runs the Ofrenda Workshop, and the Artspace Bus handles kid-facing art. It runs at The Depot rather than on Salem itself, which sidesteps the streetscape entirely.
The Rotary Christmas Parade is the payoff event. By the time Santa is coming down Salem Street in December, the street is supposed to be finished. That is the timeline the town has been marketing toward all year.
Downtown's restaurants have carried the year. If you have been ordering pickup and eating on your back porch, fall is the season to sit at their counters again.
On Salem Street proper, The Provincial at 119 N Salem opens for dinner Tuesday through Saturday and has become the neighborhood's default reservation for anniversaries and small work dinners. Scratch Kitchen & Taproom at 225 N Salem draws the after-work crowd for house-made burgers and rotating craft beer. Salem Street Pub, JD's Tavern, Daniel's Restaurant at 320 S Salem, Doherty's Irish Pub, and Anna's Pizzeria round out the block. Popovers Cafe opened at 219 N Salem back in March and has been holding down the morning shift with pastries.
Beyond the streetscape footprint, two 2025 arrivals worth putting on your fall list: Kaara Indian Restaurant at 2700 Stokesdale Ave, which opened with two dining halls, a private room, patio, and a bar built around chef signatures from a veteran kitchen team, and Lime & Lemon Restaurant & Lounge at 2025 Creekside Landing Dr, a premium Indian restaurant paired with a 7,000-square-foot late-night lounge that seats around 200. Mamma Mia Italian Bistro and Serafina Ristorante remain the go-to Italian rooms if you want a shorter drive.
The Saunders Lot expansion added 152 new spaces in the heart of downtown, boosting overall downtown parking capacity by roughly 40 percent. That is the single most important number for residents this fall. If you have been avoiding downtown because you assumed parking was worse than usual, it is actually meaningfully better than it was pre-construction. The Moore Street lot picked up spaces at the same time. The Apex Parking App shows real-time availability on both.
GoApex Route 1 has been on its detour since January 27 with stops rerouted to Hunter Street near the Metro station, N Salem at Center Street near the Halle Cultural Arts Center, and S Salem at Moore Street. Route 1 rejoins its normal path once construction finishes. GoCary Route 9, which began service to Apex in November 2025, has its own stop on Center Street next to the historic Apex Union Depot and was not affected by the streetscape work. Riders transferring between the two can use the Mason Street Municipal Building stop at 320 N Mason.
Two projects have been running at once. The Apex Peakway has been closed from S Salem Street to Towhee Drive for the SW Connector bridge, with detours funneling drivers onto Olive Chapel, Williams Street, and Salem. That closure runs through summer 2026, with the bridge itself opening in 2027. If you live on the west side and have been used to hopping the Peakway to reach Salem, fall is when the two-way return on Salem starts to matter more than the Peakway status. Next summer will look different again once the bridge opens.
"We want every person, visitor, resident, to feel like they're welcome here in The Peak of Good Living." — Mayor Jacques Gilbert
If you want a working plan for the next four months, this is the order that makes sense.
Fall 2026 is a strange, specific season in Apex. It is the return of a downtown that residents have been circling around for most of the year, plus a set of dated events built to give them a reason to come back. If you want to talk through what any of this means for your block or your home, Jeff Peterson Realty is around all fall. Schedule a free consultation whenever the timing works.